Construction - Fitout
Previous - Flooring | Next - Interior
-
Kitchen Installation
Mostly complete. We have to finish installing the range hood, kick boards and flooring. We are using Red Iron bark flooring throughout this area. The surface underneath the island bench is covered with a painted panel once the flooring is installed.
-
Tiling
Tony the tiler finally gets to start on the tiles.
He did a fantastic job especially given how fiddly it was to line everything up. He was very exacting and the alignment was spot on!
On the Home Stretch
Installation of the vanity, mirrors and skylight. All that's left after this is to choose the paint color : )
The Wardrobe
The walk in robe - mostly complete. It is a Jarrah veneer surface. We plan to use the same tiles as the ensuite/bathroom floors. Due to the layout of the house (with the narrow entrance way) we have to have a manhole on each side of the house! You can see the manhole in this picture. We bought a plastic manhole surround from the hardware store and our cabinet makers cut us a piece of laminated 20mm board. The board is much easier to clean than a painted piece of timber!
This is luxury after having our clothes hanging on a temporary stand for several months. No more dust
The Office
Choice (our fantastic cabinet makers) getting underway on the office. It is designed to match in with all of our moveable furniture which is made of myrtle and jarrah .
Choice did an amazing job, particularly of the curved wall you can see here which not only curves around to match the wall but also angles down. This was the most time consuming piece to build and fit but looks amazing.
The Workshop
Choice did another great job on the workshop.